Hi Gang
One last progress report, and then everything shudders to a halt for the summer

Got the backplate of the firebox in, banged out the backhead and all the bushes for it, sadly neglected to take a photo of any of that,
soldered it all in place, and then got on with the mud ring/foundation ring
Minnie TE Long term projectmade up a quick drill bit extension for the stay holes that are too close to the boiler tube, drilled pilot holes, enlarged the extension to hold the bit
for drilling tapping size, enlarged it one last time to hold the tap...
Minnie TE Long term projectTapping them...
Minnie TE Long term projectThose ones worked out just fine, when doing the last unobstructed one managed to break the tap

the only other 4BA tap I have is the starting tap, the un-tapered portion is not long enough to go through all the way...
oh well, plenty more available as soon as I send some money....
And here's the state of play as of now, where it will sit until the fall: from the rear
Minnie TE Long term projectand from the fore end:
Minnie TE Long term projectThe fasteners on the table are the stays for the throat plate and back plate, still have to make up the ones for the sides that will also hold
the horn plates.
A little bit more, and I'll be ready for pressure testing.

cheers, Joe