Started machining the casting for the smokebox saddle, fussed around and got it running more or less true to turn the
chucking spigot
Minnie TE Long term projectset it up in the mill to shape the curved surface with the boring head
Minnie TE Long term projectput it back in the lathe to bore through, and then drilled a steam passage up from underneath, that meets a hole in from the face
of the web on the side of the casting. Here you see the nice plug silver soldered into place on the back of that web since I got a little enthusiastic and drilled right through instead of just meeting the passage up from the bottom.....

Minnie TE Long term projectmade up the various little fittings for the blower (some obnoxious bronze stock here, pain to turn, broke two drill bits, good thing
there's only 3 more inches of it left...) starting with soldering up a tee
Minnie TE Long term projectinto the mill to reduce the arms to length and drill & tap, turned the various bushes & nuts, & the nozzle,
Minnie TE Long term projectand here it is testing for fit, after a lot of fettling of the casting
Minnie TE Long term projectSo, with this done, I can move on with attaching the smoke box to the boiler.