I managed two trailer loads of rubble to the local CA site, and three loads of funiture across town for a mate, Sunday I was "resting" Tomorrow is post hole borer time to put up some outdoor runs for my cousins Kennels, they breed rough collies under the name "Wicani" Then we have all the indoor kennels to make from OSB3 and 3x2 framing, that will be done "when wet" Should keep me out of mischief, and unfortunately, out of the workshop, for a week or two:-( I have decided that the main workshop area floor, (6mx9M) laid in 1974, is beyond redemption, and is coming out to be relaid with new mixconcrete. really not worth patching it up, so when Tony the conc is free I have a job for him! Good progress on the shed Andrew, all is safely covered in!
Phil