Well the bacon got sliced and vacuum packed - all 18 kGs, and the hams sorted and stacked ready for freezing, which left me a little bit of play time

Not enough to fit that valve block but something to help along the way.
The left hand control pod is supposed to hinge up out of the way so making getting into the cab easier. Under it is a microswitch that inhibits all the servo controls when in the up state. There is supposed to be a gas strut that toggles it between the up and down states, that fixes between two welded on 8 mm pegs, one on the pod frame and one on the seat frame. The strut and the peg on the pod were missing, as was the arm that prevents you climbing in unless the pod is up.
I'd managed to source the arm, complete with it's red handle from a breaker, but the gas strut had to be bought new at a ridiculous price.
So this afternoon I fitted them. This is officially 'A GOOD THING', as to access the relief valve block through the floor I've been jamming a bit of timber in to keep the pod 'up', so this will help when it comes to changing the block.
All fairly straight forward except that access to the 6mm bolts holding the blown plastic moulding on the pod arm was a right pain

The peg on the pod frame had broken off, and without total dismantling welding wasn't an option, so it got replaced by an 8 mm HT hex bolt
Now at least it makes it much safer leaving the cab if the engine is running, as before it was quie easy to bump the paddle control and swing the cab as you were climbing out onto the tracks
