Finally I can start on my workshop, it has been a long time coming and I had to get my digger to a point where it could do the ground work including burying some rather large bits of concrete dumped on the garden when I got john wayne and his crew in to do my parking place (long story that still makes me seethe needless to say I expect them to appear on rogue traders any time now).
Unfortunatly I neglected to take a before picture but I got the concrete blocks buried and the ground pretty level and the shuttering is in place just need to spend a little time leveling the ground inside it, preparing the reinforcing steels etc and I will be ready to pour the base maybe next weekend or the weekend after.
The plan is to use 45mm composit cladding for the walls and roof of my 6 metre by 3 metre workshop held in place by a basic framework. This will mean that no more insulation should be required.
This is going to take a while as money is going to be a problem I had enough saved until our poor cat took ill and had to have some attention from the vet, still ended up having to put him down the poor little sod

but a few weeks of belt tightening and hopefully I will have enough to proceed.