Well that was a long break - nearly four years! My wife opened a shop and with two small children as well, I ended up with no time at all for my workshop. The shop closed in summer (which is a very positive thing believe it or not!) and so I’ve been getting back into the workshop on a regular basis. I’ve finally finished reorganising and tidying (the shop stock and machining quite literally took over my workshop!) and I’ve now restarted the clock.
I’m enthusiastic and have my old spark back for machining. Hopefully there will be more updates as I intend to really push on this coming winter.
In this Part 10, I’ve drilled the frame for the main wheel and barrel arbor, made the bushes and fitted them to the frame.
Building a Tower Clock - pt10 Main Wheel Bushes and Fitting the Main Wheel Arbor