So, After being away to london at the weekend, I managed to get back into the workshop. I left you all on the edges of your collective seats (

) as I was part-way through making the small pulley. Well before I went away I managed to get the pulley finished, and got a start made on the base. I didnt get any pics as the camera was already packed for traveling.

I did use my boring bar in my mill for the first time which went ok. I bored out the hole in the base for the large pulley to fit through. I stepped up from 1/4" through to 1/2" drills, and then switched to using the boring bar, I took cuts of about 1.5mm per pass (total enlargement of hole per pass - 3mm).
After boring out the main pulley hole, the 4 fixing screw holes including clearance, voila

I then cut a little off one side to bring down the width to 3.4"(ish) from the 4" original size except from a little "ear" at the back to attach one of the spacers to. I then cut off a chunk of 1" square ali bar, and then milled down a section to make it fit and give the required clearance.

And this is where it will fit

While the vice was set up and the depth was still locked in I milled a small (2mm) rebate in the other spacer block so that it too will fit properly.

I then drilled and tapped and bored clearance holes in all the right places to attach the 2 "ears", and then attached said "ears"
Bottom view:

Top view:

And that is as far as I got today. Next will be the motor mount and also drilling and tapping the top of the "ears" and then clean the whole lot up, getting rid of all my marking (and re-marking) out.
Tim