Thanks Russ

It ain't finished yet ........

Nice bright dry day but no Darren so far (15:15)

So I've gone ahead and started pulling pipes and cables through from the Woodwork Shop where I'm sourcing electrical power, compressed air, telephone connections, and my local intranet.
So this morning I got two 25 mm MDPE pipes (water and compressed air), a 6 pair telephone cable, and two Cat5e cables pulled into the duct alongside the three phase 415v cable I pulled through a while back - I also left a heavy 'draw rope' in there for future expansion.
This afternoon I went out and collected yet another drum of rather expensive 3 core x 2.5 mm CSA 'Hi-Tuff' cable to wire up more 13 amp double sockets around the periphery of the shed, but I'm held up awaiting a couple of lengths of 4" cable tray as I've decided that the 'girder clips' I'd planned to use are not holding the incoming three phase cable securely enough.
I can't really progress much further until the handedness of the pedestrian door is decided (to place light switches) and the external flood light goes up (to finalise cable runs.
...... finger twiddling time ........