Gallery, Projects and General > Project Logs |
Wilson's Workshop Waffle |
<< < (35/74) > >> |
RobWilson:
:lol: Cheers Lads I think I will just stuff long things up the hole , and let the space develop into a spider farm :lol: --- Quote ---Ah that was the mates rates price.... :beer: :clap: How about a small stove for those cold wintry days like today...? Brrr My feet are freezing after spending all morning at the lathe making swarf from a 6" bar...... --- End quote --- What you need is a rubber mat John , much much mach MUCH ! better to stand on than cold concrete ,well unless you fit a hypocaust :dremel: Well if you come across any more giz a nudge mate :poke: , as I am thinking of using the VFD and motor on my long dead 626 CNC conversion :zap: Rob |
Pete W.:
--- Quote from: RobWilson on November 18, 2016, 01:01:06 PM --- :lol: Cheers Lads I think I will just stuff long things up the hole , and let the space develop into a spider farm :lol: SNIP Rob --- End quote --- It's not a real farm if you just let things happen - you ask Andrew! :lol: :ddb: :lol: :ddb: :lol: :ddb: |
RobWilson:
Evening Chaps , I found a place to mount the last two cabinets today , the location :palm: A bit of prep required ,remove air pipe ,socket and the crap lying about the area . I had to cut a section out of one of them as it covers were the power and air comes in from the other shop , also the new three phase supply will come thought there as well . Still lots to do around the shop :dremel: Cheers Rob |
Brass_Machine:
Wow Rob. I am supper impressed with what you are doing in your shop. Making quite the progress there! Eric |
RobWilson:
Cheers Eric :beer: Still allot to do :Doh: I would rather be machining ,but needs must . My three phase DB arrived today and having no room to store it thought I may as well stick it up on the wall . The Feng shui meter says it looks good here . :med: The panel still needs populating ,I only have the two 16 amp MCB's at the moment one for lathe and other for the new compressor . I was planning on doing the wiring over the end of year holidays ,so that gives me a month to collect the rest of the gear . I have mounted the panel about 30mm off the wall so I can drop cables down the back . Rob :beer: |
Navigation |
Message Index |
Next page |
Previous page |