Well....... I'm still here!

Unfortunately, shop time and enthusiasm have been hard to find recently.

But, I've sourced a rubber wood base, and gas tank......
Mrs. Robinson, Revisited.......It runs ok, so far.......
Mrs. Robinson, Revisited.......Trying to get me head around plumbing the water tower. It needs up/ down pipes.
I intended to solder direct into the side. But, don't like that idea, now........
Mrs. Robinson, Revisited.......Cos it needs to unplug from the engine stubs......
Mrs. Robinson, Revisited.......Thought, mebbe I could solder in, boiler type bushings.
Then plumb lower pipe through a 90* elbow, and upper, bend to horizontal.......
Mrs. Robinson, Revisited.......Anyone else got a better idea?

Are there any better looking, 8mm dia fixings, than these?
Mrs. Robinson, Revisited.......It's nice to be back!

David D