The Craftmans Shop > New from Old
Versatool Cabinets
micktoon:
Hi Andrew , thanks for posting the link to these cabinets getting done, I do not know how my search did not find it :scratch: ............I knew I had seen a post somewhere a while back.
Anyway , an excellent job you made of them and that idea about the collet holders might come in very handy indeed :thumbup:
Cheers Mick.
awemawson:
Resurrecting an old thread here, but it's the best place to put the info !
The cabinets described above were refurbished to house the tooling for the Traub CNC lathe that I had, but when it was sold, stupidly I let the cabinets go with it. Now I'm at the stage with the Beaver TC-20 CNC lathe that I need somewhere for it's tooling so went looking for more.
It seems that since then they have become 'trendy' with the yuppies that want bits of old iron in their kitchens - yes they are being used as kitch kitchen cabinets would you believe :bugeye:
So the price has gone through the roof, but I did manage to get a matching pair from opposite ends of the country. These ones are rather nice in that as well as the swinging shelves and a pair of drawers, there are also some handy 'normal' shelves.
I'm not sure if these will be blasted and re-sprayed as they are not in as bad condition as the others, and anyway the weather is not suitable probably until the spring. But I do want to make them movable. Previous ones sat on a frame with castors but I want to build the castors directly in. Problem is that the base is flanged, with a 25mm recess.
awemawson:
Now the cabinets are stout affairs with thick metal to the sides and base. I decided to make raising blocks to sit the castors on, with the weight being taken by bolts into the frame, and also by the blocks being in contact with the base.
A bit of suitable 50 mm x 25 mm bar in EN3a was ordered up, and being now to hand I cut 8 off 50 x 50 x 25 chunks and programmed the Beaver Partsmaster to spot drill, drill, and tap the 6 x 8 = 48 M6 holes to take the castors and fix the blocks to the cabinets. All went to plan, finishing yesterday evening.
This morning I made up a little drilling jig to align the mounting holes and set too on the first cabinet. The jig needed a chunk grinding off to clear the doors in use, but it all went pretty well. Heavy old lumps - I'm waiting for a friend to arrive shortly to help me turn the second one over - but one is done.
awemawson:
Derek came and helped invert the second cabinet at lunch time, and as I got a bit of time before supper I managed to 'casterate' it.
Just need to decide how to get them back on their feet and into the workshop.
russ57:
I see a forklift nearby...
Russ
Navigation
[0] Message Index
[#] Next page
[*] Previous page
Go to full version