As I have started to post some pics of my shop in the making, in my intro, I kind of thought, it not really the place for them.
So I thought I'd start a more detailed post showing the shop, and some of the works I'll be doing in it.
So here goes

The shop is split into three areas, two lower ground floor spaces and one upper mezzanine.
The main lower level is for all the heavy machines, anything over 300Kg. The space measures 6.5mx 4.5m.
Filling up the shop from the rear with machines, that way I can get any future machinery in with out too much difficulty.
So far, the machinery in the lower level is as follows:
1966 Harrison L6, with 12" swing & 24" between the centres, it's been modified to do gun barrel work, so has an outboard 4 screw spider to hold an end of a barrel.
I like the Harrison, mainly due to it's slow spindle speeds, which lends itself nicely to turning a profile on a rifle barrel.
I'll post more details about the lathe as I progress.

Next is a 1950's Hardinge HC, not wired in yet, but invaluable for anything short or repetitive. I've not had it very long, bought just before moving over to France, looking forward to using it.

On the other side of the lower level, is a 1960's Aciera F3, with vertical head, horizontal arbor support, and tilt/swivel table, only weighs half a tonne, but it the heaviest half a tonne you'll ever lift. Seriously solid, and an absolute joy to use. But two days after I got it wired up, we had a lighting strike which fried the switch board. So I'm in the middle of rewiring it.


Next to the tailstock end of the Harrison is a Clarke pillar drill, it's not bad, but it's not great. I will replace it with something better at some point, but I'm not in too much of a hurry.
The old wood burning Aga in the dinning room of the house is now my Welding/brazing bench, not really setup yet, but you can just make it out behind the stairs in the follwoing pic.

The other smaller room off the lower level, the door next to the stair in the last pic, nothing more than a store room at the moment, but it will be the "dirty" room, with blasting cabinet, blueing tanks, and heat treatment furnaces. No pics yet, as there's nothing really to see yet.
The upper level or mezzanine floor, is the main work area, with the main work bench.

The drawers to the left of the bench is made to hold all of my metrology kit, micrometers, vernier calipers, dti's etc
You can just see behind the drawers two bench grinders, one has a mop & wire on it, and the other has 8" grinding wheels. Next them will be the Clarkson Mk2 Tool & Cutter grinder, which was bought this week, just has not arrived yet.
To the back of the mezzanine, on the same side as the main work bench, is my reloading bench, again not quite finished, but it is getting there.
Next to it is an old fridge freezer, which I will be using as a store for my reloading supplies. It's not plugged in I cut off the power cord, so it's nothing more than a very well insulated cupboard.
Well I think that all I can think off for the moment, as I said it's is work in progress, I have a load of other work to get done around the place first. We have not been here in the new place for very long.
But this probably the biggest long term project I have on at the moment.