Gallery, Projects and General > Project Logs
Minnie TE Long term project
Zadig:
Joe,
I have a similar long term project on the go. It wasn't meant to take so long but distractions have dragged it out a little. If you are interested I've posted a couple of pictures here:
http://www.alloyavenue.com/vb/showthread.php?5847-Burrell-4-quot-Single-Crank-Compound-Agricultural-Engine
Joe d:
Hi Dave
I think that doing the individual strakes was less strain. Do enjoy pondering other approaches even if they don't suit
the available machinery or skill!
Zadig:
Now you've done it! Had a really quick look at your project, will have to spend a few hours reading it. Looks damn fine
from the quick peek I just took. Thanks for the link.
Joe
Joe d:
Still rolling along with wheels...
with the spokes held onto the rim with some 0-80 screws, drilled, clearance drilled the spokes, counter sunk the spokes, and
shifted to the pillar tool for tapping (first run for tapping with this, what a pleasure!) to secure the inner end of the spoke to the hub
popped it off the jig, stuck on the external bits of the hub just for a look...
bashed in the rivets to hold the spokes to the rim, and then sweated the hub bits together
trued it up in the 4-jaw and bored the axle hole to size, and here we are after a bit of clean-up
the second one is waiting for clean-up, and then that's it for front wheels!
Joe
Zadig:
Looking very well Joe.
That tapping stand looks a handy tool.
mexican jon:
--- Quote from: Joe d on March 19, 2015, 11:38:42 PM ---then turned the 3 part hubs, only interesting thing there was using a ball nose mill to form a radius on the inner piece
--- End quote ---
Now I do like that little idea :beer: Why the hell I have never thought of doing that I really don't know :doh:
:mmr:
Navigation
[0] Message Index
[#] Next page
[*] Previous page
Go to full version