Gallery, Projects and General > Project Logs
Minnie TE Long term project
<< < (34/49) > >>
Joe d:
Well, took a month longer than anticipated, but I'm now back at it!

Starting what will be a lot of operations on the cylinder block casting, a quick run over in the mill to create
one flat face to build from for all the various ops:


That done, into the lathe to bore the hole for the cylinder liner:


Using the bore to locate the casting, machined the valve face almost to finished dimension, leaving a little meat for last minute adjustments


That gave me a reference face for the vise so I could cut the curved surface that sits on the barrel of the boiler.  I used a freshly sharpened HSS tool
in a fly cutter, this casting machines like a dream!  Had an off-cut of the boiler material to use to check for fit...


Lots more to go on this bit.

vtsteam:
Joe, was that a casting to start with, or did you fabricate the curved saddle onto the cylinder, or cut it out from solid? Looking great!  :beer:
krv3000:
 Brill work   :drool:

Joe d:
Thanks Kev.  Steve:  A casting, and a very nice to machine casting indeed.  Something in the bronze family,  and heaps of machining allowance all around.

Joe

PS Steve, Don't forget to come up to Windsor next week-end!
Stilldrillin:
Joe.
It's nice to see you back among us. And, making progress......  :thumbup:

David D
Navigation
Message Index
Next page
Previous page

Go to full version