Gallery, Projects and General > Project Logs
Shay Locomotive
<< < (7/7)
BK:
 :doh: Same bridge, wrong engine :bang: this is the one I wanted.

Dan Rowe:
Wow now we are talking that is S/N 2478.

Mostly it is standard Shay built to Plan 1553. It has the Lima diamond stack for wood and the old style cast headlight bracket. The truck bolsters are wood like the Dulong trucks. The front end beam has been changed from wood to a steel section and the drawhead is not original.

The thing that really stands out to my eye is the steam dome. The Lima records say that the boiler is a 27-3/4" straight boiler but the steam dome looks round like a boot boiler. I checked the boiler print drawing number in my records and it is not the standard Plan 1553 boiler. Drawing card 15454 was not the usual boiler there is a note that says it was built to Australian rules.....very interesting.

Both the boilers for the Mapleton Tramway were special cases with copper fireboxes. They are very similar but not the same my guess is the Board of Trade Rules changed after the first one so a new drawing had to be made for the second boiler.

I suspect that the boiler for S/N 2478 also had a copper firebox. I guess i will have to get the drawing to find out for sure.

Dan

Edit: I said the steam dome was round and that is not the unusual part as the standard boiler has a round steam dome. It is the diameter that is much larger than I expected. The boot boilers have a round firebox that extends to the steam dome. That is what the boiler in the photo looks like but the straight boiler is a normal locomotive boiler with a rectangular fire box and a smaller steam dome.
Dan Rowe:
I have made a bit of progress on this project. I have nearly all of the frame castings done so that section is nearly complete.

I made the push pole pocket and the frame brace pad from metal so a rubber mold is a one step process to get castings. Here are the Mapleton push pole castings and the frame brace pads.



With more complex parts I usually start with wax and cast a metal pattern. Here are the patterns for the steam jamb and old style push pole pockets for the Dulong, brake rods and the boiler pad clamp.



Here are the machine steps for the boiler pad clamps. The casting has a cored hole that is drilled to tap 0-80. Then it can be bolted the fixture shown in the center. The sprue is trimmed and the top is faced in the mill.



The final step is to drill the rest of the holes.



Here are the steps to machine the frame brace pads. They are for the smokebox brace. The sprue end was chucked up and a light cut to true up the spud was made. The part was reversed and the sprue/chucking piece was cut true and the back side of the flange faced. Light cuts with a sharp tool are the order of the day. And remember which way to turn the hand wheels I stuffed one with a senior moment.



The final lathe operation is to face the spud and tap it 1-72. Cut off the sprue and file the back was the final operation not shown.

The chucking piece I left on the smaller push pole pocket did not really center well with a scroll chuck so I chopped it off and used the 4 jaw chuck. I used the back edge of a tool holder to center the flat sides of the casting.


I set the hand wheels to zero after centering the first casting and it was simple to quickly set the other castings square for the machine work. I used a small end mill in the tailstock to cut the counter bore but as it starts on an angled surface slow feed is needed until it makes a full cut.

The old style push pole pocket has a square hole for a square head bolt. I used a section of the same steel square square stock that was used for a core and drilled a hole in the center. This was used as a drill guide to for the hole. I used a thin section of plywood and drilled for the sprue and the four pins on the back. The sprue extends past the plywood and is clamped in the vise.



Here is a shot of the new parts for both the Dulong and the Mapleton. I am missing one of the boiler pad clamps but I only intend to add the clamp that has a common rivet with one of the running board brackets. The other boiler pad clamps will be located when the boiler is installed.



Dan
Navigation
Message Index
Previous page

Go to full version