Gallery, Projects and General > Project Logs |
Digger |
(1/7) > >> |
shipto:
Been a little quiet lately however I have not been totally idle. A while ago I purchased a smalley 5 towable digger which was modified for severn trent to use for clearing weeds from the rivers etc. This meant it was almost useless for doing the jobs I needed to do with it but it was cheap so whatever. Anyway I got around to dismantling it and am now starting on rebuilding it to make it more useful to me. so today (in between rain showers and hail) I welded the mounting for the slew ring. sorry for the massive pictures now been altered |
shipto:
Managed to dodge the showers and get a bit more done today, started with the base sides (pic 1) which I had put two stop pins (pic 2) and the slew ring base I did last week and made them into the main base (pic 3). This just needs a final support for the back of the slew ring base and then cleaning up and painting and I can bolt the slew ring to it and get started on the more interesting stuff. I still have to work out how the out riggers on the front are going to fit to this base but that should not be a major headache. I really should get it all done before painting but if I do that I will start using it and it will never get painted. The final pic shows a bit of the adjustable rear axle in place which I am praying to the god of rain I will be able to get done tomorrow. |
shipto:
Got a decent bit done today. Did some more work on the adjustable axle to the point of getting the wheels mounted. Although I got the one wheel welded on the wrong way around :Doh: which will require a strip down to put the brake the right way around now. when I first started building this one of my first thoughts was to make it able to roll out of a gateway so pic 1 shows the wheels how they will be to get in and out of a garden gate during normal use they will be the other way around. I am planning to put two 16mm pins in each side to hold the wheel assemblies into the axle but I will wait until I have it on the wheels and front supports to drill the holes for those. I also added the rear slew ring support and painted the base too (pic 2) tomorrow I will bolt the slew ring itself to this. |
Stilldrillin:
Hi Shipto. I'm finding it hard work, imagining what you are working on. :scratch: Have you got an original pic of the digger, assembled? :thumbup: David D |
shipto:
I never got around to taking a picture of mine before i started to dismantle it but there is a similar one on this vid now just imagine the same thing with twice the reach and yellow and you get what i had :D |
Navigation |
Message Index |
Next page |