Gallery, Projects and General > Project Logs
Potty Over Crank Wall Engine
<< < (24/71) > >>
saw:
Looking very good  :thumbup: :clap: :clap:
NickG:
Impressive stuff Stew  - really getting a feel for the size of it now!   :jaw: :thumbup:

Nick
cfellows:
Lot of nice work going into this engine, Stew.  I'm just following along and watching.

Chuck
sbwhart:
Thanks for your support and kind comments chaps.

Things slowed down a bit over the last week, but did get a bit more done.

What I call the return con rod, this is made from some 3mm thick * 30mm wide mild steel plate, first off drill and dowel the holes so that I can chew them out all together.



Then drill and with the boring head cut out the corners



Then with a slot drill join them up (sorry no pic)

Then onto the RT and radius the end just set this up with MK1 eye ball



Then mill the slide bar to size, giving a little extra support with a toolmaker clamp



Then counter sink the holes, and that them done



Turn and tap the spacers M3, I'll bling them up later.

This is how they assemble up.



And a few hows it looking shots.









Bogstandard:
That is starting to look very business like Stew. :thumbup:

If it runs as well as it looks, you are onto a winner.


John
Navigation
Message Index
Next page
Previous page

Go to full version