kayzed1:
--- Quote from: awemawson on September 02, 2020, 03:52:49 AM ---Guests arriving this morning so not much will be done, however I managed to 'clear the decks' ready for the second (return) wall to be built. I've only two full height panels left, one being a metre wide and the other 35 inches, so that dictates the wall length! Also I've drilled a drain hole in the exhaust stack as suggested by Kayzed1 - thanks :thumbup: --- End quote --- :clap: :thumbup: |
kayzed1:
I have had a few expensive Motorcycle exhausts go because they for got to do the hole at the low point. |
WeldingRod:
You haven't lived until you've started a big diesel with no rain cap or drain hole! Black oily crud EVERYWHERE... Sent from my SM-G892A using Tapatalk |
awemawson:
I managed to get the angle iron for the return wall screwed up to the rafters, and hence drop a vertical to locate and fix down the floor angle. It was great fun holding that one up under the rafters and screwing at the same time - it weighs about 30 kg - a combination of ropes and ladder balancing - though I only dropped it once :bugeye: So next is to mark out and fix the two remaining panels - not really looking forward to it as both top and bottom slope AND the rafters need cutting round. Might need to make templates :scratch: |
kayzed1:
Could you not use U channel top and bottom..infill the top and then slid the ends in, a couple of self tappers to hold them in place. That would make it easy for when you need extra light to change the oil....and stuff. |