Gallery, Projects and General > Member Videos
My week this week, my workshop videos!
hermetic:
I finish the copper work on the "thing" sort the tractor charging, and then get on with a massive tidy up so I can get the Holbrook bed out from its hiding place to start the rebuild! Much else happens along the way!
Phil, Warm and sunny in east yorkshire
hermetic:
Yet another week of interuptions and "odd" jobs, but I get stuck into cleaning and paint removal, and by Friday the results are beginning to speak for themselves, But it was really dirty work!!
Phil, Basking in the late summer sunshine in East Yorkshire!
hermetic:
Only a three day week, But a lot gets done! I get the headstock stripped and repainted in primer, and also after a couple of hours sanding, and needle gunning the base whilst in goggles and dust mask, I get that masked up and sprayed in red lead primer. There is a slight reaction with the original Holbrook casting filler primer, but nothing I can't cope with!! I get most of the headstock parts cleaned up, and polish the spindle and the gears and pulleys in the lathe Video will be out saturday, 4PM as usual, but I may sneak out saturday and see if I can sort the paint problems and get some black on!
Phil, in officially autumnal but still hot East Yorkshire!
hermetic:
Last weeks video, which I didn't seem to have posted properly?
A long video with a lot in it! I get down to the nitty gritty of some repairs on the SC box and selectors, quite a lot of lathecam on the covmac, but had to go to the colchester for knurling due to centre height! and get some paint on, Lots of polishing and washing goes on, and I realise the value of scotchbrite for polishing metals! I almost got 5 days in! Phil, a wet week followed by a Friday scorcher in East Yorkshire!
hermetic:
A shorter vid this week which starts with gratuitous tumble dryer repairs, same dryer, different fault! cracked drum pivot (caused by stretch belt?) and then on to the Holbrook and a week of stripping, cleaning and repairing. One cannot fail to be impressed by the build quality of this machine. 92 years after its construction, and after quite a tough life, it is still in amazing condition!
Phil, in sunny but slightly autumnal East Yorkshire
Navigation
[0] Message Index
[#] Next page
[*] Previous page
Go to full version