Well here's a bit of a update the garage is coming along great! As you can see there is lots of light and alot more room although we are still sorting things for basement, shed or turf. We went with a 30 hp digital phase converter that is due here next week.I still have to drill a hole into the basement to feed video cables that can be hooked up along with the computer / tv (eventually) and one more coat of paint for the ceiling, its come a long way from bare studs!
Yesterday we rolled out some brown parcel paper and cut out the pattern for the Haas tm1p this will allow us to find the best spot, we are thinking on a 45 to the corner to allow the 3 foot door swing for the panel.Once we have decided on a spot we have to raise the ceiling because total height for the z is 105 inches, acording to Haas it should be here at the end of the month till then I shall be yelling at the snow gods to p*ss off!