awemawson:
And yet more pumping and levelling and trowelling !

awemawson:
By this stage the concrete was basically in place but needed finessing.

So that was 30 cu M delivered as ordered and we had a bit left over (a dumper truck and a splodge on the floor!)

awemawson:
As they were cleaning up and waiting for the concrete to go off enough to 'power float' a fifth (un-ordered ) lorry of concrete rolled up  :bugeye:

A heated 'discussion' ensued between the contractor and Hanson's local office and eventually lorry #5 left with it's tail between it's legs  :clap:

Power floating then started as did final finishing of the outer skirt

Then at about 12 noon the heavens opened and we had quite a down pour - there was much leaping about covering the bit by the doors with polythene sheeting but then it cleared up and no lasting damage has been done. They have re-trowelled the outer skirt to remove the rain marks and as I type are continuing to power float.

No point in taking more pictures until I can walk on the floor hopefully tomorrow.

awemawson:
So it's now 4 pm and the last of the team has left. They have given the concrete a final power float polish and it's come up remarkably smooth - it looks as though water is sitting on the surface but it isn't - that's reflections off the polished surface .

Someone is back tomorrow to cut preferential crack slots into the slab and give it a spray

PekkaNF:
Ever wonder why the power floater is called here "helicopter" :lol: Surely if amateur tries it.