Pete W.:
Well, if it's OK for plasterers to wear stilts to do ceilings, maybe concreters should consider snow-shoes! :lol: :lol: :lol: |
awemawson:
Or high heels in this gender neutral age :bugeye: As for the pucks - I always used to use half bricks - the Pig Palace floors used half brick mesh supports and the pigs don't seem to mind :ddb: |
PekkaNF:
I have been using plastic ones, they are pretty cheap id you buy them a bag. http://www.talotarvike.com/images/big/raudoituskoroke_tassu.jpg https://asiakas.kotisivukone.com/files/rtshop.fi.kotisivukone.com/.thumbs/harja1_198x.jpg Some are that way smart than you can put mesh/rebar at two different levels. Pekka |
awemawson:
Big day today - the floor arrives! So up early to get the animal chores done first, but not early enough - the Concrete Pump was first to arrive at 06:45 rapidly followed by the concreting gang. First concrete lorry arrived 07:30 as booked but was a 7.5 cu M rather than the 6 cu M expected - never mind, less journey for the estimated 30 cu M that we need. The gang was well organised and set to with vigour - loads of pictures to follow: |
awemawson:
The day continued with the lorries arriving reasonably promptly - Hansons had two lorries on the job shuttling from the local depot, which is only three miles away). Lots of pumping and levelling and hand trowelling of the outer skirt : |