Hi Andrew,
One of the simple pleasures in life, to me at least, is watching someone skilled in their work. One that sticks out to me was a tiler putting new tiles on our kitchen wall after the new stove, sink etc were installed.
He was dealing the tiles onto the adhesive like playing cards. He would stop after 15 or so and sight along the wall to check for straightness and spacing. Very occasionally he would give one a gentle nudge then proceed.
What he did in 45min would have been a day or so if I tackled it.
Good to see and read of your progress (adventures?),
John B
Biggles:
Glad your build is getting along despite the weather. I just wondered if you are breading Turkeys for Xmas? :)
awemawson:
No turkeys thank you - I have a friend who does, and a friend who did and got his fingers burnt !
So today was the grand delivery day for the 'Tractor Shed on a Lorry' - supposed to be here about 12 noon, so before that the remains of my 'hardcore pile' was transferred to the shed base and pushed about a bit to get it vaguely level. Still need to add about 100 mm and to that end I have ordered two 20 ton lorry loads, due tomorrow after noon, of crushed concrete '75 mm to dust'. This will make a good finish layer.
In the remaining time Darren continued building up the stream bank to for a roadway access to the triangle of land behind the shed. He incorporated those heavy duty iron pipes that we pulled out as reinforcement, We also 'lost' that huge root that caused me all the grief in the early part of this project.
Then the shed lorry arrived and there was a great bustle about unloading it and putting it where it wont get damaged.
awemawson:
So with all that done Darren started Vibro-Rolling the hard core.
The 'master plan is to spread a bit of the 'crush' on it tomorrow to give a good working surface. The shed will then be erected with the 500 mm concrete side panels above the crush a bit which will be made up to 'final pre-floor' level. Then the concrete floor will be laid with about 50 mm above the panels on the inside, and 25 mm on the outside to prevent rain entering. Apparently this is standard construction for grain sheds so I'm happy to go long with it :thumbup:
awemawson:
Friday was a bit of a clearing up and tidying day while we waited for the 40 tons of crushed concrete to arrive. We needed to clear a path through to my stock trailer as it was needed at the weekend, and also move an old shed that the grandchildren had a few toys in, before it was 'land locked' behind the new tractor shed.
So first out came the 'toy shed' on the Telehandler (handy bit of kit, I wish that I had one!) and then changing it's forks for a massive bucket we moved four lorry loads of top soil (80 tons !) from their piles in the field to round the back of the tractor shed. This not only formed a base on which to stack the side sheeting and 'Z Purlins' but also considerably re-inforces the built up platform to stop things spreading. Eventually it will be tapered as a slope outwards, but we left it level as a running surface to help during erecting the steelwork.
It was all a bit hectic, as the Bull Calves in the field, being inquisitive, wanted to put their noses into everything and wander through open gates, and the field gate obviously had to be open for shifting the earth. As a safety precaution we closed the gate between the inner and outer farm yards, but of course the pair of eight wheeler lorries AND a cottage guest AND the Tescos delivery that the guest had arranged all turned up at the same time. Never mind, my hair can't go much whiter :ddb:
As things calmed down a bit Darren spread the first 20 ton of crush as a working surface inside the Tractor Shed, then Vibrorolled it in. When the steelwork is up, we can bring the sub-surface up to final level ready for concreting.
We should be 'good to go' to start bolting all the steelwork together on Monday - after all it's only very heavy 'Meccano' :lol: