Gallery, Projects and General > Project Logs |
Cnc minimill |
<< < (4/9) > >> |
chipenter:
Marked out the table limits and drilled 4.2mm for 5mm clamps , to thin for te slots all I have to do now is counersinc and tap 180 holes . |
chipenter:
Finaly finished tapping the holes glad to see the back of that job , I was supriesed how ridgid the bed felt so I won't be fitting the drawer runner as a linnier bearing . |
chipenter:
Not had a lot of time lately just the odd half hour made some small bright mild steel clamps for the table , remade the bearing holders and the exsentrics for the X and Y , glad to say this has made it much firmer , the pullys turned up from China that will be the next job . |
chipenter:
It's 8 degrees C in my shed and the machines are about 2 degrees so I don't stay there long , got some bronze pullys and started on some mounts for them , drilled and taped 3mm other end threaded 5mm may do the outher three when I warm up , John Stephenson kindly coverted a image to g code for me , it's for Mack 3 Marlin works on buffered g code command I can edit the code in the warm . |
chipenter:
Got the idler pullys finished and started on the stepper motor mounts , I found I have no 3mm washers may have to make some . |
Navigation |
Message Index |
Next page |
Previous page |