Gallery, Projects and General > Project Logs
Coke Forge Build
awemawson:
....and it's that last bit I'm USELESS at :lol:
vtsteam:
I'd call tha a pretty steady hand! :clap: :clap: :bow:
NeoTech:
When "Free hand" becomes.. cheating. :poke:
RobWilson:
Cheers Lads :beer:
A bit more done today :) , worked on the air control valve spindle , this was turned and screw cut , then slapped onto the mill like so .
Two flats mill on the screwed section .
Then a section of spindle was milled away for the gate /butterfly .
And then a couple of hole were poked in .
Next a 1 mill thick disc was turned , this needs two slots milled . I used an old bearing race to centre the chuck with the aid of my Zero set indicator (Wilson copy) , just love that tool . :dremel:
Then the disc mounted and milled .
Nearly there .
Rob :coffee:
krv3000:
hi rob as per brill work
Navigation
[0] Message Index
[#] Next page
[*] Previous page
Go to full version