Gallery, Projects and General > Project Logs
Coke Forge Build
<< < (21/53) > >>
awemawson:
....and it's that last bit I'm USELESS at    :lol:
vtsteam:
I'd call tha a pretty steady hand!  :clap: :clap: :bow:
NeoTech:
When "Free hand" becomes.. cheating.  :poke:
RobWilson:
Cheers Lads  :beer:

A bit more done today     :)  , worked on the air control valve spindle , this was turned and screw cut , then slapped onto the mill like so .



Two flats mill on the screwed section .




Then a section of spindle was milled away for the gate /butterfly .



And then a couple of hole were poked in .




Next a 1 mill thick disc was turned , this needs two slots milled . I used an old bearing race to centre the chuck with the aid of my Zero set indicator (Wilson copy) , just love that tool . :dremel:



Then the disc mounted and milled .




Nearly there .





Rob   :coffee:
krv3000:
hi rob as per brill work
Navigation