Gallery, Projects and General > Project Logs |
Coke Forge Build |
<< < (21/53) > >> |
awemawson:
....and it's that last bit I'm USELESS at :lol: |
vtsteam:
I'd call tha a pretty steady hand! :clap: :clap: :bow: |
NeoTech:
When "Free hand" becomes.. cheating. :poke: |
RobWilson:
Cheers Lads :beer: A bit more done today :) , worked on the air control valve spindle , this was turned and screw cut , then slapped onto the mill like so . Two flats mill on the screwed section . Then a section of spindle was milled away for the gate /butterfly . And then a couple of hole were poked in . Next a 1 mill thick disc was turned , this needs two slots milled . I used an old bearing race to centre the chuck with the aid of my Zero set indicator (Wilson copy) , just love that tool . :dremel: Then the disc mounted and milled . Nearly there . Rob :coffee: |
krv3000:
hi rob as per brill work |
Navigation |
Message Index |
Next page |
Previous page |