NeoTech:
Well gray is stylish.. will pour flooring epoxy at a later stage getting a 2-3mm thick protective surface. =)

RobWilson:
Nowt wrong with Grey , the floor dose look belting  :thumbup: , how long before you can give it a coat of sealer and get things moved back in ?


Rob 

NeoTech:
Guessing it will take a 4-6 weeks or so.. i can use the floor from a week from now, but not seal it until later.. humidity would make it crack if i did. =)

NeoTech:
So after several detours my shop is coming together, only some electrics and new doors left.



My new compressor arrived a tad bit early, you can see it on the left there..
And this is from when i moved it in there.. by myself, by hand.. its effin 220kg..

NeoTech:
And it finally is time to move in..
Got lights up, gates inserted, electricity is drawn.. at last.. time to get back to the cnc part of this thread..