Gallery, Projects and General > Project Logs |
Poppin Engine build. |
<< < (15/15) |
Stilldrillin:
--- Quote from: awemawson on February 21, 2015, 04:20:27 PM ---Relevant graphs are on page 2 http://www.farnell.com/datasheets/22660.pdf They quote 250 deg C as the temperature to raise it to to break the joint --- End quote --- You are quite correct, Andrew! :thumbup: But, I would be happy to use, what I have always used. In this small, lightly stressed application........ David D |
Stilldrillin:
--- Quote from: ian_in_the_midlands on February 21, 2015, 05:31:07 PM ---What sort of temperatures is the cylinder likely to reach? --- End quote --- At the standard end. Not much, above the temp of boiling water. If at all....... David D |
fcheslop:
Will it not be possible to simply drill the holes deeper and rethread?? or drill and tap the frame for a couple of grub screws to lock the cylinder into the frame. What size did you use 2mm cheers |
Navigation |
Message Index |
Previous page |